The development program

"«Marbopharm» Development plan” progect on manufacturing finished drugs» is planned to be realized. The financial sources of the progect are incomes, depreciation charges, loan.

  • Program of development
  • Program of development
  • Program of development
  • Program of development
  • Program of development
  • Program of development
  • Program of development

The development strategy includes:

  • The expansion of the product range: more than 30 new preparations are being develoed and registrated now;

  • A phased reconstruction of pre-2016 manufacturing;

  • Introduction of new modern technologies;

  • Transition to international pharmaceutical standards.


The events of the plan are orientated on the significant expansion of solid and liquid pharmaceutical preparations production, the ensure of the licensing requirements, the transition to the development of new drugs on the current level and reducing energy costs.

The reconstruction of the manufacturing of the solid pharmaceuticals: manufacture of tablets, powders, capsules is planned to locate on the unused production facilities, total reconstruction square is about 2600 sq.m.

The modernization of the liquid medications manufacture is being done to exclude manual labor, operations automation and for bringing the site into compliance with the requirements of the GMP on a 1030 sq.m.

The reconstruction of the raw materials warehouse and finished goods warehouse is planned as well as the creation of the 1330 sq.m of space for finished goods storing on 1460 pallet.

The reconstruction of the QCD labs and research labs along with the providing it with the modern equipment and devices is also planned.

The reconstruction of the substance manufacture is orientated on bringing the sites into compliance with the requirements of the GMP.

In order to reduce heat consumption, and its rational usage the modernization of the boiling room with the installation of the new pot with less power in order to be used in autumn-winter time is provided.